A lorry is filled with sand from a Backhoe loader.
If the Backhoe loader is worked for \(1\) hour, \(\frac{7}{10}\) of the lorry gets filled.
How much of the lorry is filled if the Backhoe loader worked for
(a) \(\frac{1}{3}\) hour \(=\) of the lorry is filled
(b) \(\frac{6}{7}\) hour \(=\) of the lorry is filled
(c) \(\frac{8}{7}\) hour \(=\) of the lorry is filled
(d) \(\frac{9}{10}\) hour \(=\) of the lorry is filled
(e) For the lorry to be full , how long should the Backhoe loader be working?
\(=\) \(\text{hours}\)
[NOTE: With simplication]