Solve the below given problem:
A crane at a construction site lifts \(15\) cement bags, each weighing \(78\ N\), to the top of a building \(20\ m\) high. The lifting operation takes \(78\ s\). Find the power developed by the crane.
The power developed by the crane \(=\) \(W\)
[Note: Enter the answer upto one decimal value]